Kitchen and plumbing design plans for the Delaware Stadium renovations had called for a 6-inch soda line to serve several soda stations on the concourse. When the EDiS BIM team created the 3D model of the hallway, it became clear that a large radius of the soda line would be within eye view and detract from the aesthetic of the concourse. Using CAD Auto-Fabrication MEP, NAVIS, and a little creativity, the BIM team was able to design an alternate route for the soda lines that kept them hidden from sight. The solution was tested in the model, and it was verified that the new solution would be effective and could be implemented without affecting a single trade on the job. This workaround was completed BEFORE construction, which saved time, money, and the headache of a potential change order!